Download Solution PDFBy which of the following year the targets aimed under Bharat Nirman is to be achieved?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFBharat Nirman was a rural infrastructure development program launched by the Government of India in 2005 to strengthen basic infrastructure in rural areas.Key Points
- The targets under Bharat Nirman were set to be achieved by 2009.
- The program was launched with a four-year timeframe (2005-2009) to improve key sectors of rural development.
- Its primary objectives included:
- Irrigation: Assuring irrigation to additional 10 million hectares of land.
- Rural Roads: Connecting all villages with a population of 1000 (or 500 in hilly/tribal areas) with all-weather roads.
- Rural Housing: Constructing 60 lakh (6 million) houses for the rural poor.
- Drinking Water: Providing safe drinking water to all uncovered habitations.
Hence, the correct answer is 2009.
Last updated on Mar 4, 2025
->MP Mahila Supervisor Answer Key is out on the official website. Candidates are invited to raise objections till 20th April 2025.
-> Earlier, MP Mahila Supervisor Hall Ticket for the written examination was released.
-> Total number of 660 vacancies have been announced for the MP Female Supervisor post.
-> Candidates had applied online from 9/01/2025 to 23/01/2025.
->The salary of the appointed candidates will be in the pay-scale of Rs. 5,200-20,200 with grade pay of Rs. 2400 per month.